South Shore WWTP Digester Gas ReplacementWastewater treatment plant digester gallery update in Oak Creek, Wisconsin
HVAC Installations:
• Five air handling units
• 10 exhaust fans
• Two supply fans
• Four unit heaters
• Six hot water pumps
• Five boiler stacks
Water/Wastewater Installations:
• Digester gas purifier media removal from 22 gas purifier tanks
• Stainless steel, galvanized steel, and ductile iron piping
• Six new digester gas flowmeters
• Modification to two existing digester gas flowmeters
• Two waste gas flares
• Underground digester gas and natural gas piping
• 14 new condensate/sediment traps
• Stainless steel condensate piping
A NOTE FROM OUR CUSTOMER:
“I have worked with Ahern on several projects, and I am continually impressed with the quality of their work. They take pride in what they do… I would not hesitate to work with them on future water/wastewater treatment jobs.”
Joe Grinker
Resident Engineer
Click here for further project details.
|